Solar, electrical, and security — under one roof
Tier-1 panels, SEDA-certified installation, eATAP submitted for you. Most Malaysian homes break even in 5–7 years and keep saving for 18 more.

Three pillars, one team
Solar Installation
Residential, commercial, and industrial PV — from preliminary study to commissioning, with eATAP handled.
Electrical Engineering
Wiring, panel upgrades, and certified electrical works for residential, commercial, industrial, and government buildings.
Security Systems
Alarm, CCTV, access control. Faulty finding & troubleshooting backed by our electrical engineering depth.
Solar — end-to-end, EPCC-style
Consultation, project development, and operation & maintenance — all under one roof.
- Preliminary Study
- Site Survey & Assessment
- Quotation & Proposal
- Engineering & Design
- Procurement
- Construction & Commissioning
- Licensing Application
- Customer Services
- System Analysis & Reporting
- Product Warranties & Replacement
- Panel Cleaning
Six reasons your roof should be working
Typical Malaysian terrace home with 8 kWp drops from RM 380/mo to RM 50–80/mo.
Excess solar exported back to the grid at RM 0.27/kWh (≤1500 kWh/mo).
Solar-equipped homes typically sell faster with a notable price premium.
Pair with battery for blackout protection during PMB outages.
On Tier-1 panels and our workmanship. Local team, local response.
A 10 kWp system offsets ~9 tonnes of CO₂ per year in Malaysia.
What size system do you need?
Match your monthly TNB bill to a typical recommendation. We'll quote your exact size after a site visit.

Jinko Tiger Neo + Antai mounting — Tier-1, only.
We don’t stock bargain modules. Every SS Solar install uses Jinko JKM605-630N N-type bifacial panels paired with Antai mounting hardware certified for Malaysian roof types.
- ✓Jinko Tiger Neo: 22.5%+ module efficiency, 30-year linear power warranty
- ✓Antai mounting: tile, metal seam, concrete, ground-mount — all certified for Malaysia
- ✓All panels SIRIM-listed and warranty-registered in your name
Solar ATAP — replaces NEM 3.0
From consult to commissioning in 3–5 weeks
Free site visit. We measure roof, shading, and review TNB bill. Same week.
Custom layout, kWp sizing, ROI projection. Itemised RM quote within 3 days.
1–2 days on-site. We file eATAP, coordinate TNB inspection, and commission.
Wiring, panels, and certifications
- Installation of Wiring Service
- Faulty Finding & Troubleshooting
- Electrical Panel Upgrades
- Commercial & Industrial Wiring
- Residential Wiring Services
- Government Building Projects
Alarms, CCTV, access control
- Installation of Alarm System
- Installation of CCTV System
- Access Control Systems
- Faulty Finding & Troubleshooting
- 24/7 Monitoring Solutions
Common questions from Malaysian homeowners
How long does installation take?+
1–2 days on-site, 3–5 weeks total including eATAP submission and TNB inspection.
Do I need to do anything for Solar ATAP?+
No. We submit eATAP in your name end-to-end. Zero paperwork on your side.
What happens if a panel breaks?+
25-year product warranty on Jinko panels. We replace and re-commission.
Can I add a battery later?+
Yes. Solis and Swatten inverters are battery-ready — add BYD, LVTS, or Sigenergy storage anytime.
Tile vs metal vs flat-concrete roofs?+
We work with all three. Antai mounting hardware adapts to clay, concrete, or metal seam.
Will there be roof leaks?+
Our roofers seal every penetration. We carry RM 1m public liability insurance.
How much can I really save?+
Typical Malaysian home with 8 kWp: TNB bill drops from ~RM 380/mo to RM 50–80/mo.
Do you service outside Johor?+
Yes — we have active installs across Selangor (Puchong, Ecoworld) and serve nationwide.
Bilingual support?+
Yes — Bahasa Malaysia, English, and Mandarin handled by the team daily.
Ready to power up your roof?
Free site visit, transparent quote, eATAP submitted for you. Most homes break even in 5–7 years and keep saving for 18+ years more.